Sollihøgdatunnelen

E16 Bjørum-Skaret

E16 on the Bjørum–Skaret section through the municipalities of Bærum and Hole has now been completed, featuring 8.4 kilometres of new four-lane motorway between Sandvika and Hønefoss. The project includes two twin-tube tunnels: the 3.4-kilometre-long Sollihøgda Tunnel cutting through the top of Sollihøgda, and the 800-metre-long Bukkesteinshøgda Tunnel.

  • Customer: Skanska
  • End customer: Norwegian Public Roads Administration

Trafsys deliverables:

  • Network
  • CCTV
  • Local PLC system
  • Camera based AID
  • Emergency phones
  • Cabinets
E16 Bjørum - Skaret